Esto Vir Group: Miami Chapter

Esto Vir Group: Miami Chapter

Members of the Esto Vir Group gave of their time and labor to tear down and dispose of the old shed and keystone at the ACU House! The shed was approximately 10 feet by 14 feet. It was made with a wood frame and aluminum siding. Armed with some protective gloves, elbow grease, and sweat, the guys tore down the entire shed and emptied its contents into a dumpster. We look forward to utilize the free space to continue beautifying and maximum the property for the activities of the ACU.

Many thanks to the members of Esto Vir!

All Saints Day: Miami Chapter

All Saints Day: Miami Chapter

University of Miami Student Group

University of Miami Student Group

0